Play Video
THE ASK
Delta needed a structural solution for protecting the 200-foot-long cargo conveyor between its terminal and aircraft at the Los Angeles International Airport. Not only did the shelter have to be narrow and tall to fit the tight space, it also had to be constructed rapidly while meeting strict building codes.
HOW SPRUNG DELIVERED
Sprung provided a fast solution, supplying a cost-effective, durable structure that was customized to meet the precise physical dimension requirements of the project. Built to withstand 130-mile-per-hour winds, the structure ensures safe and effective protection from the elements.
THE SPECS
- 12’ 4” wide by 200’ long and 14’ 7” tall