Play Video
THE ASK
The City was building new fire stations and renovating existing ones, and it needed interim facilities in place during that process.
HOW SPRUNG DELIVERED
Knowing that Sprung structures are relocatable, durable and flexible, the City of San Diego turned to Sprung to supply interim stations at four locations. Delivery from time of order was just four weeks, and each structure was erected in only six days.
THE SPECS
- Station #5 - 40’ wide x 45’ long
- Station #17 - 30’ wide x 45’ long
- Station #22 - 30’ wide x 45’ long
- Station #45 - 30’ wide x 45’ long