Play Video
THE ASK
Shawnigan decided to make a significant investment in its hockey program by building an arena on campus. Speed and overall costs were significant factors in assuring the viability of the project.
HOW SPRUNG DELIVERED
The school held its first hockey game inside its new Sprung structure just six months after breaking ground. The state-of-the-art arena features seating for 500 spectators, climate-controlled viewing from the second floor, and a tall peak height and bright interior membrane to enhance the overall playing environment. Other features include large dressing rooms, concession services, rest rooms and storage.
THE SPECS
- 120’ wide x 330’ long | Fully insulated
- Bayberry Green Dupont Tedlar membrane which, blends in well with the surrounding trees on the campus