Play Video
THE ASK
As water levels rose and communities were evacuated, High River officials called for various structures to replace damaged essential community buildings. The structures needed to be durable, constructed quickly, relocatable and adaptable.
HOW SPRUNG DELIVERED
Sprung swiftly supplied multiple high-performance structures, including a fully insulated retail complex that held 21 businesses, a Salvation Army donation center, an office complex for housing High River town administration, a welcome center and library, and two fire stations. These structures served as vital components for maintaining local business and community continuity.
THE SPECS
- 30’ wide x 300’ long Retail complex
- 60’ wide x 100’ long Salvation Army donation centre
- 80’ wide x 120’ long Office complex to house High River town administration
- 80’ wide x 120’ long Welcome Centre and Library
- 50’ wide x 75’ long Fire Station