Play Video
THE ASK
Newmont Goldcorp’s Peñasquito mine is a highly productive and rapidly growing operation in the state of Zacatecas, Mexico. The site required a dining building in which to feed more than 5,000 miners a day. Speed of construction and a lower-cost solution were critical.
HOW SPRUNG DELIVERED
The dining facility was completed in just six months from the date of the order. The finished result is a beautiful, comfortable structure with an exterior mosaic pattern, glazing walls and a bright, spacious and relaxing interior.
THE SPECS
- 100’ wide x 300’ long | R30 insulation | Glazing walls
- Multicolored Dupont Tedlar exterior membrane